Calculate Roof Pitch

RUN RISE RAFTER PITCH

Pitch Results

0/12
Pitch
rise/run
0.0
Angle
degrees
0.0
Slope
percent
1.000
Pitch Factor
multiplier
--
Category
--
0:0
Ratio
rise:run
IRC R903.4: Minimum roof slope for asphalt shingles is 2:12 (9.5°). Low-slope applications (2:12 to 4:12) require additional underlayment and proper flashing.

Rafter Length Calculator

Rafter Dimensions

0' 0"
Rafter Length
total
0 m
0' 0"
Run
horizontal
0' 0"
Rise
vertical
0"
Overhang Rafter
length
0.0
Plumb Cut
degrees
0.0
Seat Cut
degrees
Note: Add 6-12" to calculated length for ridge and tail cuts. HAP (Height Above Plate) should match rafter depth minus birdsmouth seat cut.

Pitch Converter

Conversion Results

0/12
Pitch
0.0°
Degrees
0.0%
Percent Slope
0:12
Ratio
1.000
Pitch Factor
0.000
Radians

Roof Pitch Reference (IRC 2021)

Pitch Degrees Factor Category Roofing Suitability
1/124.8°1.003FlatBuilt-up, membrane only
2/129.5°1.014LowMin for asphalt shingles*
3/1214.0°1.031LowLow-slope shingles OK
4/1218.4°1.054StandardAll shingles, walkable
6/1226.6°1.118StandardIdeal for most materials
8/1233.7°1.202SteepUse caution walking
10/1239.8°1.302SteepRoof jacks required
12/1245.0°1.414Very SteepScaffolding recommended
*IRC R905.2.2: Asphalt shingles on slopes 2:12 to 4:12 require double underlayment or self-adhering polymer modified bitumen sheet.