Slab / Pad Dimensions
Results
Tip: Standard ready-mix trucks hold 10 cubic yards. Order slightly more than calculated to account for spillage and uneven subgrade.
Round Column (Sonotube)
Square/Rectangular Column
Concrete Wall
Concrete Steps
Results
Note: Step calculations assume a solid pour. Actual volume may vary based on exact shape and landing configuration.
Quick Reference
Volume (CF) = Length (ft) x Width (ft) x Thickness (ft)
Volume (CY) = Cubic Feet / 27
Bag Coverage (approximate):
- 60 lb bag = 0.45 CF
- 80 lb bag = 0.60 CF
Standard truck capacity: 10 cubic yards